Hem and Boo Sports Training Lead 1

Hem and Boo Sports Training Lead 1" x 72"

Hem and Boo Tough Wheel with Rope Large

Hem and Boo Tough Wheel with Rope Large

Hem and Boo Sports Training Long Lead - Reflective in Orange

Hem and Boo Sports Training Long Lead - Reflective in Orange

Prices From £14.99
Availability: In stock
SKU
Hem and Boo Sports Training Long Lead - Reflective in Orange

The Hem and Boo Sports range is crafted from tightly woven, durable nylon, offering a sporty feel. They feature reflective elements for enhanced visibility during early morning and autumnal evening walks, making them ideal for mastering recall and distance control training. Coordinate the sports harness, collar, and training lead for a complete system.

* Recall and Distance Control
* Durable and Strong
* Reflective for Safety 

3 Lengths, 5M x 25mm, 10M x 25mm, 15M x 25mm

More Information

More Information
SKU Search 38058 38059 38060